The aim of SMED is to reduce inventories by retrofitting the machine to a new production process without disturbing the production flow. The final goal can be achieved if a machine or production line can be converted within a production cycle so that a one-piece flow or even a mixed-model one-piece flow can be implemented even with the most diverse products Can In this case, the stocks in the line are also equal to zero. The main objective is to reduce waste, viz., time wasting, by applying the SMED technique.
The process was developed by Shigeo ShingÅ, who as an external consultant was instrumental in the development of the Toyota production system (TPS). Implementation: In several iterative steps the set-up time is only improved by organizational measures and later by technical measures. To minimize the cost, it is important that the steps are completed in the given order. The experience is that each step results in a reduction of the set-up time from 50 to 60% (in relation to the previous step). Major investments are made at a very late stage, if at all.
The main objective is to reduce waste, viz., time wasting, by applying the SMED technique.Normally the SMED-Method is cobined with the Kaizen Approach to have a more agile, efficient waste reduction.